说明:三维空间上单点渐进成形轨迹的开发自动生成策略描述。Top contour
Lofted surface
surace
Fig. 2 Points generated on the contour toolpath
Bottom
Cotour
Fig. 2), so that the 3D spiral toolpath(Fig. 3) can be subsequently
generated by linear interpolation between consecutive contour <shaxihou> 上传 | 大小:1mb
说明:基于CAD技术的API自动控制算法开发,以实现一种新型的渐进成形工艺CAD API BASED TOOL PATIL CONTROL FOR SILEET FORMINO
83
PkM with
Linear actuators
Master tool
with slave tool
Fig. 2. Prototype of a PKM-based DSF machine
The prototype has an industrial fagOr 8070 control. It can han <shaxihou> 上传 | 大小:2mb
说明:使用非确定性技术和球形工具获得用于加工STL表面的螺旋路径渐进成形J.L. Huertas-Talon et al. Computer-Aided Design 50(2014)41-50
Triangle i
Side il, 12, 13
Triangle A
Sidej1,j2, j3
Side side
Ik
Contour side
sid∈2△→ no contour
yes
Store side i, as contour
Fig 2. Condition of one side <shaxihou> 上传 | 大小:3mb
说明:KUKA MxAutomation 函数库说明
Knowledge of the robot controller system
Advanced PLC programming skills
Advanced knowledge of field bus interfaces <qq_36996229> 上传 | 大小:4mb